Roadworks
Roads around the Edward River region may be affected or closed for various reasons including roadworks, building work, major events or filming. Find all the latest here.
Roads around the Edward River region may be affected or closed for various reasons including roadworks, building work, major events or filming. Find all the latest here.
-
Temporary Road Closure - Spirit of the Muster
Share Temporary Road Closure - Spirit of the Muster on Facebook Share Temporary Road Closure - Spirit of the Muster on X (formerly Twitter) Share Temporary Road Closure - Spirit of the Muster on Linkedin Email Temporary Road Closure - Spirit of the Muster linkWhere:
Cressy Street Between Napier Street & Edwards Street
Dates:
Wednesday 30th September 2026
9am - 4pm
Details:
- Both lanes will be closed
Please take care:
- Detours will be in place
- Follow the directions of signs and traffic control
- Exercise Caution

-
Temporary Road Closures - Spirit of the Muster Street Festival Cressy Street & Napier Streets
Share Temporary Road Closures - Spirit of the Muster Street Festival Cressy Street & Napier Streets on Facebook Share Temporary Road Closures - Spirit of the Muster Street Festival Cressy Street & Napier Streets on X (formerly Twitter) Share Temporary Road Closures - Spirit of the Muster Street Festival Cressy Street & Napier Streets on Linkedin Email Temporary Road Closures - Spirit of the Muster Street Festival Cressy Street & Napier Streets linkWhere:
Cressy Street Between Napier Street & Edwards Street
Napier Street Between George & Cressy Street
Dates:
Tuesday 29th September 2026
2:00pm - 11:00pm
Details:
- Both lanes will be closed
Please take care:
- Detours will be in place
- Follow the directions of signs and traffic control
- Exercise Caution

-
Hardinge Street Road Reconstruction Project
Share Hardinge Street Road Reconstruction Project on Facebook Share Hardinge Street Road Reconstruction Project on X (formerly Twitter) Share Hardinge Street Road Reconstruction Project on Linkedin Email Hardinge Street Road Reconstruction Project linkRoadworks are continuing along Hardinge Street, Deniliquin, between Ochtertyre St and Harfleur St, as part of the Hardinge Street Road Reconstruction Project.
Dates: February to August 2026
Operating Times: 7am to 5pm, Monday to Saturday
Traffic & Access Impacts:
The road is open with no detours. Access to properties and businesses will be maintained, however some changes are in place:
A reduced speed limit of 40km per hour is in place.
The bus stop next to Coles (at the vacant block) has been permanently moved to Wood Street.
The bus stop opposite Deniliquin Plaza will remain operational but may shift as works progress.
-
Entry to Coles and Deniliquin Plaza has changed - vehicles and pedestrians should use the temporary access via Wood Street.
Please follow signage through the vacant block and take care around construction traffic.
Harvey Norman and Mitre10 can be accessed from Harfleur Street.
Temporary traffic controls are in place.
Please follow all signage and directions from traffic controllers.
Thank you for your patience while we complete these essential works.
For any queries, please contact Project Manager Dilip Boppidi at Council offices on 03 5898 3000.

Roadworks are continuing along Hardinge Street, Deniliquin, between Ochtertyre St and Harfleur St, as part of the Hardinge Street Road Reconstruction Project.
Dates: February to August 2026
Operating Times: 7am to 5pm, Monday to Saturday
Traffic & Access Impacts:
The road is open with no detours. Access to properties and businesses will be maintained, however some changes are in place:
A reduced speed limit of 40km per hour is in place.
The bus stop next to Coles (at the vacant block) has been permanently moved to Wood Street.
The bus stop opposite Deniliquin Plaza will remain operational but may shift as works progress.
-
Entry to Coles and Deniliquin Plaza has changed - vehicles and pedestrians should use the temporary access via Wood Street.
Please follow signage through the vacant block and take care around construction traffic.
Harvey Norman and Mitre10 can be accessed from Harfleur Street.
Temporary traffic controls are in place.
Please follow all signage and directions from traffic controllers.
Thank you for your patience while we complete these essential works.
For any queries, please contact Project Manager Dilip Boppidi at Council offices on 03 5898 3000.

-
Temporary Reduced Speed - Conargo Road
Share Temporary Reduced Speed - Conargo Road on Facebook Share Temporary Reduced Speed - Conargo Road on X (formerly Twitter) Share Temporary Reduced Speed - Conargo Road on Linkedin Email Temporary Reduced Speed - Conargo Road linkWhere:
Between 4483 and 4144 Conargo Road, Hartwood
Dates:
Monday 23rd March 2026 - Wednesday 31st March 2027
24 hours/day
Details:
- Both directions of traffic will be affected
- Workers will be completing road works on the Conargo Road as part of the Yanco Creek Modernisation Project.
Please take care:
- Reduced Speed of 40km/h in place
- Follow the directions of signs and traffic control
- Drive to the conditions
- Allow extra time to travel

Where:
Between 4483 and 4144 Conargo Road, Hartwood
Dates:
Monday 23rd March 2026 - Wednesday 31st March 2027
24 hours/day
Details:
- Both directions of traffic will be affected
- Workers will be completing road works on the Conargo Road as part of the Yanco Creek Modernisation Project.
Please take care:
- Reduced Speed of 40km/h in place
- Follow the directions of signs and traffic control
- Drive to the conditions
- Allow extra time to travel

-
Temporary Speed Reduction - Pretty Pine Road
Share Temporary Speed Reduction - Pretty Pine Road on Facebook Share Temporary Speed Reduction - Pretty Pine Road on X (formerly Twitter) Share Temporary Speed Reduction - Pretty Pine Road on Linkedin Email Temporary Speed Reduction - Pretty Pine Road linkWhere:
'Woorooma' - Pretty Pine Road, Moulamein
Dates:
Monday 9th March 2026 -Wednesday 8th April 2026
7:00am - 6:00pm daily
Details:
- Both directions of traffic will be affected, 500m East & West of Event Entry
- Reduced Speed in place for the safe entry into the Confest Site
Please take care:
- Reduced Speed of 40km/h in place
- Follow the directions of signs and traffic control
- Drive to the conditions
- Allow extra time to travel

Where:
'Woorooma' - Pretty Pine Road, Moulamein
Dates:
Monday 9th March 2026 -Wednesday 8th April 2026
7:00am - 6:00pm daily
Details:
- Both directions of traffic will be affected, 500m East & West of Event Entry
- Reduced Speed in place for the safe entry into the Confest Site
Please take care:
- Reduced Speed of 40km/h in place
- Follow the directions of signs and traffic control
- Drive to the conditions
- Allow extra time to travel

-
Temporary Speed Reduction - Cobb Highway - Wanganella
Share Temporary Speed Reduction - Cobb Highway - Wanganella on Facebook Share Temporary Speed Reduction - Cobb Highway - Wanganella on X (formerly Twitter) Share Temporary Speed Reduction - Cobb Highway - Wanganella on Linkedin Email Temporary Speed Reduction - Cobb Highway - Wanganella linkWhere:
Cobb Highway - Wanganella
Dates:
Monday 9th March 2026 - Saturday 19th December 2026
24 hours/day
Details:
- Both directions of traffic will be affected
- Workers will be conducting work as part of the Yanco Creek Modernisation Project at Eight Mile Creek.
Please take care:
- Reduced Speed of 40km/h in place
- Follow the directions of signs and traffic control
- Drive to the conditions
- Allow extra time to travel

Where:
Cobb Highway - Wanganella
Dates:
Monday 9th March 2026 - Saturday 19th December 2026
24 hours/day
Details:
- Both directions of traffic will be affected
- Workers will be conducting work as part of the Yanco Creek Modernisation Project at Eight Mile Creek.
Please take care:
- Reduced Speed of 40km/h in place
- Follow the directions of signs and traffic control
- Drive to the conditions
- Allow extra time to travel

-
Temporary Reduced Speed Limit - Zara Road
Share Temporary Reduced Speed Limit - Zara Road on Facebook Share Temporary Reduced Speed Limit - Zara Road on X (formerly Twitter) Share Temporary Reduced Speed Limit - Zara Road on Linkedin Email Temporary Reduced Speed Limit - Zara Road link
Where:
Zara Road - Wanganella
Dates:
Monday 23rd March 2026 - Wednesday 31st March 2027
24 hours/day
Details:
- Both directions of traffic will be affected
- Workers will be conducting works on the Wanganella Weir regulators as part of the Yanco Creek Modernisation Project.
Please take care:
- Reduced Speed of 40km/h in place
- Follow the directions of signs and traffic control
- Drive to the conditions
- Allow extra time to travel

Where:
Zara Road - Wanganella
Dates:
Monday 23rd March 2026 - Wednesday 31st March 2027
24 hours/day
Details:
- Both directions of traffic will be affected
- Workers will be conducting works on the Wanganella Weir regulators as part of the Yanco Creek Modernisation Project.
Please take care:
- Reduced Speed of 40km/h in place
- Follow the directions of signs and traffic control
- Drive to the conditions
- Allow extra time to travel

-
Reduced Speed Notification - Hardinge Street
Share Reduced Speed Notification - Hardinge Street on Facebook Share Reduced Speed Notification - Hardinge Street on X (formerly Twitter) Share Reduced Speed Notification - Hardinge Street on Linkedin Email Reduced Speed Notification - Hardinge Street linkCouncil will soon commence Stage 2 of water main relocation works along Hardinge Street, between Ochtertyre Street and Wood Street, Deniliquin. During the following period a roadworks speed limit of 40km per hour will be in place.
Proposed Start Date: From Monday 16 Feb 2026
Estimated Completion: By Friday 5 June 2026
Operating Times: 7am to 5pm Monday - Saturday
The water main work includes under-boring of the road, new water main pipes installation and restoration of nature strips.
Traffic & Access Impacts:
- Access to properties will be maintained during water main works.
- Footpaths on Rams Oval side will be closed, with detour and signage in place.
- Temporary traffic controls will be in place.
- Please follow signage and directions from traffic controllers.
For any queries, please contact Project Manager Dilip Boppidi at Council offices on 03 5898 3000.
Council will soon commence Stage 2 of water main relocation works along Hardinge Street, between Ochtertyre Street and Wood Street, Deniliquin. During the following period a roadworks speed limit of 40km per hour will be in place.
Proposed Start Date: From Monday 16 Feb 2026
Estimated Completion: By Friday 5 June 2026
Operating Times: 7am to 5pm Monday - Saturday
The water main work includes under-boring of the road, new water main pipes installation and restoration of nature strips.
Traffic & Access Impacts:
- Access to properties will be maintained during water main works.
- Footpaths on Rams Oval side will be closed, with detour and signage in place.
- Temporary traffic controls will be in place.
- Please follow signage and directions from traffic controllers.
For any queries, please contact Project Manager Dilip Boppidi at Council offices on 03 5898 3000.
-
Reduced Speed Notification - Conargo Road
Share Reduced Speed Notification - Conargo Road on Facebook Share Reduced Speed Notification - Conargo Road on X (formerly Twitter) Share Reduced Speed Notification - Conargo Road on Linkedin Email Reduced Speed Notification - Conargo Road linkWhere:
Between Forest Creek & Piccaninny Creek - Conargo Road
Dates:
Friday 12th December 25 - Thursday 18 December 25.
Monday 12th January 26 - Friday 15th June 26
24 hours/day
Details:
- Both directions of traffic will be affected
- Workers will be conducting works on the Forest Creek Return regulators as part of the Yanco Creek Modernisation Project.
Please take care:
- Reduced Speed of 80km/h in place
- Follow the directions of signs and traffic control
- Drive to the conditions
- Allow extra time to travel
Where:
Between Forest Creek & Piccaninny Creek - Conargo Road
Dates:
Friday 12th December 25 - Thursday 18 December 25.
Monday 12th January 26 - Friday 15th June 26
24 hours/day
Details:
- Both directions of traffic will be affected
- Workers will be conducting works on the Forest Creek Return regulators as part of the Yanco Creek Modernisation Project.
Please take care:
- Reduced Speed of 80km/h in place
- Follow the directions of signs and traffic control
- Drive to the conditions
- Allow extra time to travel
-
Powerpole Replacement - Edwardes Street
Share Powerpole Replacement - Edwardes Street on Facebook Share Powerpole Replacement - Edwardes Street on X (formerly Twitter) Share Powerpole Replacement - Edwardes Street on Linkedin Email Powerpole Replacement - Edwardes Street linkCLOSED: This discussion has concluded.Where:
Edwardes Street - Between Wood & Sloane Streets
Dates:
Sunday 29th June 2025
Between 8am to 4:00pm
Details:
- Stop/Go will be in place for this area.
Please take care:
- Allow extra travel time
- Drive to the conditions
- Follow the directions of signs and traffic control