Roadworks
Roads around the Edward River region may be affected or closed for various reasons including roadworks, building work, major events or filming. Find all the latest here.
Roads around the Edward River region may be affected or closed for various reasons including roadworks, building work, major events or filming. Find all the latest here.
-
Temporary Road Closure - Augustus Street
Share Temporary Road Closure - Augustus Street on Facebook Share Temporary Road Closure - Augustus Street on Twitter Share Temporary Road Closure - Augustus Street on Linkedin Email Temporary Road Closure - Augustus Street linkWhere:
Augustus Street Deniliquin between Browning Street & Conargo Road
Dates:
Sunday 8 March 2026
8:30am - 3:15pm
Details:
- Both lanes will be closed, open to local traffic only
- Essential Energy will be carrying out powerline replacement works in the area.
Please take care:
- Detours will be in place
- Follow the directions of signs and traffic control
-
Reduced Speed Notification - Hardinge Street
Share Reduced Speed Notification - Hardinge Street on Facebook Share Reduced Speed Notification - Hardinge Street on Twitter Share Reduced Speed Notification - Hardinge Street on Linkedin Email Reduced Speed Notification - Hardinge Street linkCouncil will soon commence Stage 2 of water main relocation works along Hardinge Street, between Ochtertyre Street and Wood Street, Deniliquin. During the following period a roadworks speed limit of 40km per hour will be in place.
Proposed Start Date: From Monday 16 Feb 2026
Estimated Completion: By Friday 5 June 2026
Operating Times: 7am to 5pm Monday - Saturday
The water main work includes under-boring of the road, new water main pipes installation and restoration of nature strips.
Traffic & Access Impacts:
- Access to properties will be maintained during water main works.
- Footpaths on Rams Oval side will be closed, with detour and signage in place.
- Temporary traffic controls will be in place.
- Please follow signage and directions from traffic controllers.
For any queries, please contact Project Manager Dilip Boppidi at Council offices on 03 5898 3000.
-
Temporary Road Closure - Fitzroy Street
Share Temporary Road Closure - Fitzroy Street on Facebook Share Temporary Road Closure - Fitzroy Street on Twitter Share Temporary Road Closure - Fitzroy Street on Linkedin Email Temporary Road Closure - Fitzroy Street linkWhere:
Fitzroy Street Deniliquin between Box Street & Yarra Street
Dates:
Sunday 29 March 2026
8:30am - 3:00pm
Details:
- Both lanes will be closed, open to local traffic only
- Essential Energy will be carrying out powerline replacement works in the area.
Please take care:
- Detours will be in place
- Follow the directions of signs and traffic control
-
Reduced Speed Notification - Conargo Road
Share Reduced Speed Notification - Conargo Road on Facebook Share Reduced Speed Notification - Conargo Road on Twitter Share Reduced Speed Notification - Conargo Road on Linkedin Email Reduced Speed Notification - Conargo Road linkWhere:
Between Forest Creek & Piccaninny Creek - Conargo Road
Dates:
Friday 12th December 25 - Thursday 18 December 25.
Monday 12th January 26 - Friday 15th May 26
24 hours/day
Details:
- Both directions of traffic will be affected
- Workers will be conducting works on the Forest Creek Return regulators as part of the Yanco Creek Modernisation Project.
Please take care:
- Reduced Speed of 40km/h in place
- Follow the directions of signs and traffic control
- Drive to the conditions
- Allow extra time to travel
-
Transmission Line Stringing - Romani Road
Share Transmission Line Stringing - Romani Road on Facebook Share Transmission Line Stringing - Romani Road on Twitter Share Transmission Line Stringing - Romani Road on Linkedin Email Transmission Line Stringing - Romani Road linkThe EnergyConnect project team are continuing to advance construction activities on the transmission line from Buronga, NSW to Dinawan, near Bundure. From Saturday 25 October to Tuesday 18 November 2025, weather permitting, our project delivery partner Downer Group, has scheduled works for stringing transmission lines across Romani Road, approximately 18 km west of Booroorban, in the Edward River Local Government Area
What:
Stringing transmission lines between tower structures
Where:
Romani Road - for exact location see map below:

Dates:
Saturday 25 October to Tuesday 18 November 2025
7:00am to 7:00pm - weekdays and weekends
Details:
- traffic delays of up to 10 mins
- traffic control in place
- reduced speed limits between 40 km/h and 100 km/h during work hours
Please take care:
- Allow extra travel time
- Drive to the conditions
- Observe speed limit signs
- Follow the directions of signs and traffic control
-
Road Hazard - Nesbits Road - Stud Park
Share Road Hazard - Nesbits Road - Stud Park on Facebook Share Road Hazard - Nesbits Road - Stud Park on Twitter Share Road Hazard - Nesbits Road - Stud Park on Linkedin Email Road Hazard - Nesbits Road - Stud Park link

Where:
Nesbits Road - Stud Park
Dates:
Ongoing
Details:
The edge of the road has a drop off and is a traffic hazard. These restriction will be in place until Council Staff are able to remediate the area.
- Reduce Speed in this area
- Exercise Caution
- Allow extra time to travel
- Check Signage
-
Powerpole Replacement - Edwardes Street
Share Powerpole Replacement - Edwardes Street on Facebook Share Powerpole Replacement - Edwardes Street on Twitter Share Powerpole Replacement - Edwardes Street on Linkedin Email Powerpole Replacement - Edwardes Street linkCLOSED: This discussion has concluded. -
Hazard - Damaged Stock Grids - Booroorban-Tchelery Road
Share Hazard - Damaged Stock Grids - Booroorban-Tchelery Road on Facebook Share Hazard - Damaged Stock Grids - Booroorban-Tchelery Road on Twitter Share Hazard - Damaged Stock Grids - Booroorban-Tchelery Road on Linkedin Email Hazard - Damaged Stock Grids - Booroorban-Tchelery Road linkWhere:
Booroorban-Tcherley Road
Grid 1 chainage 0.3Grid 5 chainage 9.6Grid 12 chainage 28Dates:
Ongoing until staff are able to replace the stock grid.
Details:
Stockgrids are damaged and a reduction in speed has been introduced.
- Reduce Speed in this area
- Exercise Caution
- Allow extra time to travel
-
Temporary Closure of Walkway: Duncan Street to Golf Club
Share Temporary Closure of Walkway: Duncan Street to Golf Club on Facebook Share Temporary Closure of Walkway: Duncan Street to Golf Club on Twitter Share Temporary Closure of Walkway: Duncan Street to Golf Club on Linkedin Email Temporary Closure of Walkway: Duncan Street to Golf Club link
What:
The walkway connecting Duncan Street to the rear of the Golf Club is closed to public access due to a structural failure in the inner retaining wall. Please note this issue does not impact the levee wall.
Where:
The walkway connecting Duncan Street to the rear of the Golf Club.
Dates:
Effective immediately until further notice.
24 hours, 7 days a week
Details:
- For the safety of the community, permanent barriers and signage are being installed to prevent access to the area.

-
Change of Speed Limit Alert
Share Change of Speed Limit Alert on Facebook Share Change of Speed Limit Alert on Twitter Share Change of Speed Limit Alert on Linkedin Email Change of Speed Limit Alert linkWhat:
Change of Speed Limit Alert - Signage reducing the speed to 40km/h has been installed until such time as our crews can attend to regrading.
Where:
Pyles Road at MIL Bridge
Dates:
Effective immediately, until such time as our crews can attend to regrading
24 hours, 7 days a week
Details:
- Roads will remain open
- Speed reduction in place.
Please take care:
- Allow extra travel time
- Drive to the conditions
- Follow the directions of reduced speed signs.